http://www.evergreen-shipping.us
Rule Revision Detail



Rule : 023-W02   of   EGLV-618 Revision : 0
Effective : 20160721
WH - Wharfage Charges at U.S.A.

Japan         JPY 3980/RT

                       Exp:Jul/19/24 | Eff:Jul/20/24
-------------------------------------|--------------
 Taiwan        CFS only    TWD 380   |  TWD 380
               20’         TWD 5600  |  TWD 6160 (A)
               40’         TWD 7000  |  TWD 7700 (A)
               40’HC       TWD 7875  |  TWD 8650 (A)
               45’HC       TWD 8860  |  TWD 9500 (A)

 Korea         KRW 10,500/RT       
 Hong Kong     HKD 198/RT
 Macao         HKD 131/RT
 Singapore     SGD 25.25/RT
 Philippines   USD 11/RT
 Malaysia      MYR 35/RT
 Brunei        BND 5/RT 
  
China 
 1. The origin CFS Receiving charge for CFS cargo from ports and   
    points in Guangdong shall be CNY 120 per revenue ton, subject    
    to a minimum of CNY 120.                                       
 2. The Origin CFS Re ceiving charge for CFS cargo from ports and   
    points in Fujian shall be CNY 20 per revenue ton               

Indonesia  :  USD 20/RT
           :  USD 27/RT (Hazardous)

  Exceptions:
 (1) For rubber shipment, charge both CFS stuffing charge
     and laden containers handling charge.

     Surabaya - CFS USD108/20' and THC/L USD95/20'
     Panjang, Belawan - CFS USD90/20' and THC/L USD95/20'

     Palembang - 
       CFS USD92/20' and THC/L USD95/20'


 (2) THE CFS Receiving charge is not applicable to coffee tea.

 Sri Lanka     USD 10/RT

 Thailand      THB 170/CBM 
               THB 235/100 Kilos  
               THB 5800/20'      
               THB 10300/40'   
               THB 11538/40'HC 
               THB 12933/45'HC 
               THB 9513/40'RH  

 Bangladesh
  Chittagong - BDT 170/M    ; BDT 335/W
               BDT 6000/20' ; BDT 8000/40'

  Mongla     - BDT 325/M    ; BDT 550/W
               BDT 6576/20' ; BDT 9090/40' ; BDT 10605/40'HC

 All others  - BDT 6000/20' ; BDT 8000/40' 


 Cambodia      USD 6/CBM

 India:

 Bombay (Mumbai)
   Non-Haz   : INR 495/M       ; INR 835/W
               INR 10865/20'   ; INR 18515/40'
   Haz       : INR 565/M       ; INR 960/W
               INR 12435/20'   ; INR 22660/40'
   Reefer    : INR 21795/20'RS ; INR 29445/40'RH
   Over-Size : INR 10850/20    ; INR 18410/40'

 Nhava Sheva:
 NSICT
   Non-Haz:  - INR 515/M     ; INR 870/W
             - INR 11295/20' ; INR 20665/40'
   Haz :     - INR 610/M     ; INR 1035/W
             - INR 13465/20' ; INR 24730/40'
   Over-Size - INR 14375/20' ; INR 24850/40'

 JNPT
   Non-Haz : - INR 540/M     ; INR 920/W
             - INR 11930/20' ; INR 21930/40'
   Haz :     - INR 655/M     ; INR 1110/W
             - INR 14415/20' ; INR 26620/40'
 Mulund
  NSICT
  Non-Haz : INR 445/M ; INR 750/W
  Haz     : INR 600/M ; INR 1020/W

  JNPT
  Non-Haz : INR 415/M ; INR 700/W
  Haz     : INR 435/M ; INR 740/W

 Calcutta:
 CPY -    INR 645/CBM     ; INR 1025/MT
          INR 12600/20'   ; INR 18715/40'
 (Reefer) INR 1900/MT
          INR 22120/20'RS ; INR 36255/40'RH
 Non-CPY  INR 12600/20'   ; INR 18715/40'
 (Reefer) INR 22120/20'RS ; INR 36255/40'RH

 Cochin
  Dry         - INR 370/M     ; INR 510/W
  Private CFS - INR 9075/20'  ; INR 13335/40'
  Reefer      - INR 340/M     ; INR 600/W
                INR 10775/20' ; INR 15490/40'
  Port CFS    - INR 9140/20'  ; INR 14000/40' &40'HC 

 Madras
  - INR 315/M  ; INR 425/W
  - INR 3998 + USD 23.38/20'
  - INR 6379.75 + USD 42.54/40'

 Tuticorin     - INR 110 + USD 0.78/M
                 INR 190 + USD 1.63/W
                 INR 1800/20' ; INR 2835/40'
   Offdock CFS - INR 1932 + USD 27.49/20'
                 INR 3155 + USD 37.01/40'

 Kandla - INR 5500/20' ; INR 8500/40' 

 Haldia:
            - INR 780/MT    ; INR 490/CBM
              INR 9550/20'  ; INR 15270/40'
    Reefer  - INR 1550/MT
              INR 17470/20' ; INR 29520/40'RH

 All Others - INR 5675/20'  ; INR 10475/40'

(Note: Charges for container size 20', 40' are for LCL/FCL cargo only)


(A)-Rate increase



Rule : 023-W02   of   EGLV-618 Revision : 1
Effective : 20170423
WH - Wharfage Charges at U.S.A.

Houston, TX     : USD 65 per container
Miami, FL       : USD 65 per container
Mobile, AL      : USD 65 per container
New Orleans, LA : USD 65 per container (Eff:Apr/23/17)(A)

(A)-New added



Rule : 023-W02   of   EGLV-618 Revision : 2
Effective : 20190427
WH - Wharfage Charges at U.S.A.

Houston, TX     : USD 65 per container
Miami, FL       : USD 65 per container
Mobile, AL      : USD 65 per container
New Orleans, LA : USD 65 per container
Tampa, FL       : USD 65 per container (Eff:Apr/27/19)(A)

(A)-New added



Rule : 023-W02   of   EGLV-618 Revision : 3
Effective : 20200327
WH - Wharfage Charges at U.S.A.

Houston, TX         : USD 65 per container
Miami, FL           : USD 65 per container
Mobile, AL          : USD 65 per container
New Orleans, LA     : USD 65 per container
Port Everglades, FL : USD 65 per container (Eff:Mar/27/20) (A)
Tampa, FL           : USD 65 per container 

(A)-New added